Sealing Pipes and Ducts

In addition to sealing pipes from remote locations, Steve Vick International offer a range of products for sealing annular spaces around primary pipelines and for sealing the ends of pipes and ducts.

FOAMBAGS™ and FOAMCAPS™

Foam cap-end installation at Harwell BEPO storage block

Foam cap-end installation at Harwell BEPO storage block

FOAMBAGS™ and FOAMCAPS™ can be developed to suit a range of shapes and sizes and Steve Vick International sealants are highly effective at encapsulating and fixing any loose debris or contamination prior to cutting.

The procedure involves introducing FOAMBAGS™ into a duct or pipe through an intrinsically safe hot tapping system. Once the foam inside the bag has cured (after 30 minutes) it can be safely cut through.

This technique has radically reduced exposure times and cost during glovebox removal at UK nuclear sites.

Downloads & Video

Case Study - Harwell Site In Oxfordshire

Harwell BEPO storage block on completion of Steve Vick International foam filling operation

Harwell BEPO storage block on completion of Steve Vick International foam filling operation

Steve Vick International’s techniques have been used across various UK nuclear sites over the past 20 years. One particularly noteworthy project took place at the Harwell site in Oxfordshire.

The project involved designing NDA Supply Chain Awardbespoke caps and FOAMBAGS™ and installing them to fill 250 ducts in the BEPO storage block.

The BEPO storage block project won ‘Best application of an innovative solution(s) with tangible savings/benefits – SME’ category at the NDA Estate Supply Chain Awards 2014. Click here to read the full story

Testing

The National Nuclear Laboratory has carried out tests on the cured foam used in Steve Vick International’s FOAMBAG™ and associated systems and have rated it as having an 8-10 year lifespan in an area with a background radiation level of 7–9Sv.

For further details please contact Rich Ditte:

07768 811580

rich.ditte@stevevick.com

Ask an expert