Stoke-On-TrentFlow stopping overhead Gas main

FLOW STOPPING OVERHEAD GAS MAIN

These overhead mains, situated close to a gas holder in Stoke-on-Trent, were being dismantled prior to the site being developed for housing.

The pressure was reduced from 2 bar to 50mbar, allowing a Steve Vick International Special Contract Service team to install two FOAMBAGS™ in the 20” and 24” diameter pipes. The pipes could then be cut out and dismantled.

Click to enlarge
FOAMBAGS were installed in the 20" and 24" mains
Click to enlarge
Large diameter overhead gas pipes were flowstopped prior to being dismantled