Todo Nuevo en No Dig 2012 - Steve Vick Internacional, Párese No. 45

First pipe coil trailer of its kind
los 90/500 is the first pipe coil trailer of its type capable of transporting and dispensing a 500 metre coil of up to 90mm diameter PE. It is a completely new design from the company which began manufacturing trailers in the 1980s. Con un marco de tambor hexagonal, the central drum is moved from loading/dispensing position to the transport position by hydraulics. The method of removing and replacing the drum bars in order to load the pipe coil has been simplified and is now a one-man operation.

El nuevo remolque tiene una serie de ventajas clave: Al tomar un 500 bobina de metro a diferencia de un típico 100 metros, que permite a los operadores ahorrar dinero reduciendo el desperdicio de tubería. Desde una perspectiva de seguridad, the pipe can be loaded and dispensed without operatives having to reach inside or climb onto the frame.

Debido a una configuración de tambor central mejorada, tubería se dispensa más rápida, más rápido y más suave en comparación con remolques sin tambor central. A medida que la bobina es totalmente compatible con el tambor hexagonal, re-coiling pipe is an easy, single-handed process.

A pesar de su gran capacidad, the new Steve Vick trailer weighs only 1900kg fully laden allowing it to be towed by a typical transit vehicle and the combination of its light weight and single axle makes the 90/500 easy to manoeuvre.

New Pipe Handler for mini excavators
Steve Vick is introducing not one but two new Mini Pipe Handlers at No Dig. These tools attach to mini excavators to allow PE pipe, up to 180mm in diameter, to be manoeuvred on site and inserted quickly and securely from the safety of the cab.
The first model inserts pipe up to 125mm and the larger model handles pipe up to 180mm diameter. Both are suitable for use with a typical 1.5 a 3 tonne excavator.

El diseño único ‘forma de J’ de la mordaza permite que la tubería sea del lado cargado, eliminando la necesidad de operarios para trabajar en la zanja. Pipe manoeuvring and insertion operations are controlled entirely from the safety of the cab and a one-stage set up is all that is required for the entire insertion process.
velocidades de inserción típico de hasta 10 son posibles metros por minuto.

La mordaza en forma de J permite una profundidad tubería constante a ser mantenida para ayudar a la inserción y necesita espacio libre solamente 35 mm de tierra, minimizar la profundidad de la zanja requerida. The 360° swivel head provides the operator with maximum manoeuvrability when positioning and inserting the pipe whilst the clamp design prevents damage to the surface of the PE and minimises slippage in wet weather.

A ‘cracking’ tool
The newest additions to the pipe handling range are the MACAW Pipe Crackers, hydraulic tools for safe, effective breaking out of cast iron mains.
The range consists of two models, the MACAW for breaking 8 – 24” and the Mini MACAW for 4 – 6” mains.

The larger of the two, the MACAW, llamado así porque sus tuberías de craqueo brazos parecen al poderoso pico del ave sudamericana, attaches to the quick-hitch or bucket pins of a mini excavator. Controlado desde la cabina, y el uso de la energía hidráulica de la excavadora, las maniobras operativas los brazos alrededor de la tubería y luego se aplica una presión suficiente para romper la tubería.
La adaptación a todos los entornos web y para la conveniencia de las condiciones del lugar diferentes, el Mini Macaw tiene dos medios de potencia hidráulica; a hand pump, or a mini excavator.
Cuando se aplica energía hidráulica, los brazos del elevador aprietan el tubo de toma de los discos del interruptor, que actúan como los puntos de presión, romper la tubería.

Both models accommodate a full range of pipe sizes and can be used on inserted or abandoned mains.

Comparte este artículo: